求大神帮忙提供几篇外文文献网站,急

谁有关于反应堆二回路的英文文献和配套的中文翻译,文献5-7页为最佳.求大神发给我,急死我了._百度作业帮
拍照搜题,秒出答案
谁有关于反应堆二回路的英文文献和配套的中文翻译,文献5-7页为最佳.求大神发给我,急死我了.
谁有关于反应堆二回路的英文文献和配套的中文翻译,文献5-7页为最佳.求大神发给我,急死我了.
The steam and power conversion system produces electrical power by driving a turbine generator rated at 900 MWe (maximum continuous output 983,8 MW) electrical output with steam from the nuclear steam supply system. The Turbine consists of a 3 000 rpm double flow HP and three double flow LP Cylinders and is directly connected, to the 26 000 volt, 3 phase, 50 Hz generator. Equipment for regenerative feedwater heating, pumping to required pressure and various auxiliary systems complete the power conversion system. The only safety related system involves main steam from the steam generators to the bevel downstream of pipe restraint, feedwater piping from the bevel downstream of pipe restraint to the steam generator and the auxiliary feedwater system. Main steam from the nuclear steam supply system flows through three Steam Lines to the live steam manifold located in the Turbine House, from the Live Steam Manifold steam lines provide steam to the Turbine Stop Valves, Deaerator, 1st and 2nd Stage Moisture Separator Reheaters, Steam Converter and turbine driven Feedwater Pumps. Main Steam enters the high pressure cylinder, flows through the blade paths, and exhausts to the moisture seperator reheaters where moisture is removed and the steam reheated, the steam then enters the low pressure cylinders, flows through the blade paths, and exhausts to the condenser. Steam is extracted at selected points in the main turbine cycle for regenerative feedwater heating. The condenser condenses the steam exhausted from the LP cylinders, together with steam exhausted from the Feedwater Pump turbine as well as other miscellaneous flows from the cycle. Condensate is taken from the condenser and is pumped by the condensate extraction pumps through the gland steam condenser (part flow), through three LP closed feedwater heaters to the deaerating feedwater heater and storage tank. Feedwater is then taken from this storage tank to the feedwater pumps and is pumped through the high pressure feedwater heaters to the steam generator inlets.
A turbine bypass system is capable of bypassing 85,15 % of the Maximum Reactor plant capability at full steam pressure, with Inlet Steam conditions of 66,3 bar abs, 0,32 per cent wet, at the NI/Cl interface. The system design incorporates back-up means (power operated relief valves) for heat removal under any loss of normal heat sink, i.e., due to main steam stop valves trip, loss of circulating water flow, to accommodate reactor shutdown heat rejection requirements. The power operated relief valves also provide pressure control for hot shutdown. 2 x 50 % steam turbine driven and 1 x 50 % electric motor-driven feedwater pumps are provided to ensure that adequate feedwater is supplied to the steam generators for heat removal under all circumstances, including loss of electrical power and normal heat sink. A reduced amount of feedwater flow can be maintained until power is restored or until reactor decay heat removal can be accomplished by other systems. 蒸汽发电系统由核蒸汽供应系统供汽,驱动额定电输出功率为900MWe(最大持续出力为983.8MW)的汽轮发电机发电.汽机由一台3000rpm的双流高压缸和三台双流低压缸组成,并同26000V、3相、50Hz的发电机直接相连. 完整的蒸汽发电系统还包括给再生水加热并加压到所需压力的设备,以及各种辅助系统.由蒸汽发生器到管道约束支架下游管焊口的主蒸汽管道、由管道约束支架下游管焊口到蒸汽发生器的给水管道以及辅助给水系统是唯一的安全相关系统. 来自核蒸汽供应系统的主蒸汽,通过三条蒸汽管线流到汽机厂房内的新蒸汽支管.从新蒸汽支管出来的各条蒸汽管线分别向汽机截止阀、除氧器、第一二级汽水分离/再热器、蒸汽转换器和汽动给水泵供汽.主蒸汽进入高压缸,流经各级叶片流道,排入汽水分离/再热器,在那里去除水分并经过再热,然后进入低压缸,流经各级叶片流道,排入凝汽器. 在主汽机循环中选定的一些抽汽点抽出蒸汽,用于对水再生加热. 凝汽器将低压缸排出的蒸汽、给水泵汽机排出的蒸汽以及热力循环中其它各种来源的汽流进行冷凝.凝结水抽取泵唧送凝汽器内的凝结水,部分经密封蒸汽凝汽器(主要部分经三台低压闭式给水加热器),流往给水除氧加热器和贮水箱.然后给水泵唧送该贮水箱的给水,经高压给水加热器流往蒸汽发生器进口.
在满载蒸汽压力下,当核岛和常规岛(NI/CI)界面处的蒸汽进口工况为66.3bara、0.32%湿度时,汽机旁路系统可以旁路电站最大蒸汽流量的85.15%.系统设计还包括在任何正常热阱丧失时排走热量的备用手段(动力驱动卸压阀),即在主蒸汽截止阀跳闸、循环水流量丧失时,能适应反应堆停堆后的排热需求.动力驱动卸压阀还可为热停堆提供压力控制.装备了2台50%的汽动给水泵和一台50%的电动给水泵,以确保在所有情况下,包括电源丧失和正常热阱丧失情况下,向蒸汽发生器提供足够的给水以排走热量.降低流量的给水能维持到电源恢复,或者维持到其它系统可以把反应堆衰变热排出.急求几篇关于问题学生的3000字的外文文献!!_百度知道
急求几篇关于问题学生的3000字的外文文献!!
业论文写的是关于问题学生转化策略
需要几篇有关的外文参考文献(要包含题目,如果有也请发给我,不需要翻译的。因为自己也有找,但没有找到原文。满意的会加分,但是找不到比较符合的,于是来求助了。另看到有篇Strategies for managing problems student in the classroom
看题目感觉比较符合,谢谢、作者、出处等)
我有更好的答案
按默认排序
都是因为我论文的选题新颖所给我带来的好处,尽量采用多的专业术语  可能口语化的表达会给人带来亲切感   先到百度文库,这样会给人耳目一新的感觉,用正规格式书写  参考正规的论文文献,最好在计算机上完成写作过程  如果有条件最好利用电脑来完成写作过程,但论文是比较专业的形式。  六,而影响到你论文的质量。不要因为格式问题,女孩子不仅注意自己的形象问题,打印出的文字显的正规。4,大量的文献查阅会你的论文写作铺垫,仔细参考,而低估你的论文,随时翻阅,影响文章的连贯,找一篇此类文档中文的,中文放下面,仔细修改  导师会给你一些关于你论文建设性的意见。最好涉及护理新领域。  八,有颇多的经验,节省时间,听取导师意见。而且干净整洁,写出提纲,得到导师的赞许,成稿打印好交给导师  无论你的字写的多么优美,大量的文献放在手边,一气呵成  做好充分的准备,然后把英文放上面,幸亏男友是电脑高手,一个晚上的劳动,或者电脑当机,好处以下几点,差点就全没了。2:1,借鉴别人的思路,方便写作,肯定要比手写的快,术语化会提升自己论文的水平,一个一个查阅是很不方便的,无论打字的速度慢到什么程度,写一段,是有可能做为文献来查阅和检索的,这样会打断自己的思路,不要每天写一些。希望可以帮到你。3,防止突然停电,和高分,选题要新颖,当然也要自己一定的语言功底做基矗  三。毕竟导师是发表过多篇论文,不会让导师因为看不懂你的龙飞凤舞,大量文献做基础  仔细查阅和你论文题目和研究范围相关的文献。否则就恨着电脑,所以都是在电脑上完成,在电脑随时对文章进行修改编辑都是非常的方便,文献都是用数据库编辑,修改编辑,书面的东西也反映你的修养和气质。  二。  七,认真修改,帮我找回。提前先在电脑上摘要出重点。   一。而且在写作过程不会觉得语言平乏,论文格式,哭死算了。  五,以及新进展。  这次我的论文的成功,所以论文语言的专业化,而且交流不存在任何的问题,每天改一些,随时存档,存一段。  四,还是按照惯例来,方便,或是谷歌在线翻译翻成英   文。本人就是吃了这个大亏,和好的语言,然后用有道翻译
其他类似问题
外文文献的相关知识
为您推荐:
等待您来回答
下载知道APP
随时随地咨询
出门在外也不愁急求关于行政首长问责的外文文献,最好带翻译_百度知道
急求关于行政首长问责的外文文献,最好带翻译
怎么都找不到 求大神帮忙
这是一道待解决的难题
您的回答被采纳后将获得系统奖励20(财富值+经验值)+难题奖励30(财富值+经验值)
我有更好的答案
按默认排序
没有问题行政首长问责的外文文献我可以给。
其他类似问题
外文文献的相关知识
为您推荐:
等待您来回答
下载知道APP
随时随地咨询
出门在外也不愁求提供几篇关于中小企业人力资源管理研究的外文文献_百度知道
求提供几篇关于中小企业人力资源管理研究的外文文献
PS:只要英文原文就行了
提问者采纳
外文文献有,翻译没有,翻译得靠你自己了,希望能满足你的需要,能帮到你,如果需要直接百度Hi中留言同时贴出问题的链接地址和邮箱地址即可,或者告知其他安全可靠方式提供,多多给点悬赏分吧,急用的话请多选赏点分吧,这样更多的知友才会及时帮到你,我找到也是很花时间的如果需要直接百度Hi中添加我好友,留言同时贴出问题的链接地址和邮箱地址即可,或者告知其他安全可靠方式提供近期好像百度Hi无提示信息留下邮箱地址如旦梗测妓爻幻诧潍超璃dgfgafd的126\q邮箱一六*零****八二*二QQ邮箱
嗯 原文就可以 我的邮箱是7 8 6 0 4 1 8 0 0艾特qq.com
外文文献已发送企鹅邮箱,翻译没有,翻译得靠你自己了,希望能满足你的需要,能帮到你,多多给点悬赏分吧,急用的话请多选赏点分吧,这样更多的知友才会及时帮到你,我找到也是很花时间的
提问者评价
其他类似问题
人力资源管理的相关知识
按默认排序
其他1条回答
您可以上知网查下。知网资料很全的。
为您推荐:
等待您来回答
下载知道APP
随时随地咨询
出门在外也不愁

我要回帖

更多关于 外文文献翻译 的文章

 

随机推荐